Prepainted Galvanized Building Connection 0.5 Inch 2 Inch Round Tube Agriculture Greenhouse Gi Pipe
Product Parameters
| Material | Q195,Q235,Q345 |
| Tolerance | ±5% |
| Application | Construction |
| Processing services | Cutting/Welding/Bending |
| Shipping date | 15-21days |
| Price terms | FOB/CFR/CIF/EXW/ETC |
| Standard | ASTM,BS,GB |
| Package | Standard Sea-worthy Packing |
| Product name | Round pipe |
| Technical standard | Cold Rolled /Hot Rolled |
| Thickness | 0.6 - 30 mm or customized |
| Length | 6m,12m or customized |
Imperial Specifications (Inch)
| Inch | Nominal Diameter (DN) | Outer Diameter (mm) | Wall Thickness Range (mm) |
|---|---|---|---|
| 1/2" | 15 | 21.3 | 0.6-2.5 |
| 3/4" | 20 | 26.9 | 0.6-2.5 |
| 1" | 25 | 33.7 | 0.6-3.0 |
| 1¼" | 32 | 42.4 | 0.6-3.5 |
| 1½" | 40 | 48.3 | 0.6-3.5 |
| 2" | 50 | 60.3 | 0.7-4.0 |
| 2½" | 65 | 76.1 | 0.7-5.5 |
| 3" | 80 | 88.9 | 0.8-6.0 |
| 4" | 100 | 114.3 | 0.9-6.0 |
| 5" | 125 | 139.7 | 0.9-6.0 |
| 6" | 150 | 168.3 | 1.0-6.0 |
| 8" | 200 | 219.1 | 1.0-10.0 |
| 10" | 250 | 273.0 | 1.3-10.0 |
Product Description
Round Tube Applications
1. Primarily used for conveying water, gas, air, oil, and heating hot water or steam, limited to generally low-pressure fluids.
2. Primarily used for straight-seam welded square tubes for mine air compression, drainage, and axial gas discharge.
3. Primarily used for machinery, automobiles, bicycles, furniture, hotel and restaurant decoration, and other mechanical components and structural parts.
With Q195A. Q215A. Q235AProduction Flow Chart

Project Case


Pack And Ship

Certificate





Customer Praise


Plant And Equipment




FAQ
Q: Are you trading company or manufacturer ?
A: We are manufacturer.
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
Q: How long is your delivery time?
A: Generally it is 7-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.








