High-quality Australian standard 250UB H-beams S235 275 355jr hot-rolled H-beams
Product Parameters
| Designation | Unit Weight (kg/m) |
Standard Sectional Dimension (mm) |
sectional Area (cm²) |
|||||
| M | H | B | t1 | t2 | r | A | ||
| 100UC一 | 15 | 14.8 | 97 | 99.0 | 5 | 7 | 10.0 | 18.87 |
| 150UC | 23 | 23.4 | 152.4 | 152 | 6.1 | 6.8 | 8.9 | 29.82 |
| 30 | 30 | 157.6 | 153.0 | 6.6 | 9.4 | 8.9 | 38.6 | |
| 37 | 37.2 | 161.8 | 154 | 8.1 | 11.5 | 8.9 | 47.34 | |
| 150UB | 14 | 14 | 150.0 | 75.0 | 5 | 7 | 8.0 | 17.85 |
| 18 | 18 | 155.0 | 75.0 | 6 | 9.5 | 8.0 | 22.96 | |
| 200UB | 18 | 18.2 | 198.0 | 99.0 | 4.5 | 7 | 11.0 | 23.16 |
| 23 | 22.3 | 201.6 | 133.0 | 5.0 | 7 | 8.9 | 28.68 | |
| 25 | 25.4 | 203.2 | 133.0 | 5.8 | 7.8 | 8.9 | 32.31 | |
| 30 | 29.8 | 207.0 | 134.0 | 6.3 | 9.6 | 8.9 | 38.24 | |
| 250UB | 26 | 25.7 | 248.0 | 124.0 | 5.0 | 8 | 12.0 | 32.68 |
| 31 | 31.4 | 251.5 | 146.0 | 6.1 | 8.6 | 8.9 | 40.08 | |
| 37 | 37.3 | 256.2 | 146.0 | 6.4 | 10.9 | 8.9 | 47.51 | |
| 310UB | 32 | 32.0 | 298.0 | 149.0 | 5.5 | 8 | 13.0 | 40.80 |
| 41 | 40.4 | 304.0 | 165.0 | 6.1 | 10.2 | 11.4 | 52.08 | |
| 47 | 46 | 307.2 | 166.0 | 6.7 | 11.8 | 11.4 | 59.29 | |
Product Description
Applications of Australian Standard H-beams:
Heavy Equipment Bases and Brackets: Robust bases and support frames for large mining machinery, crushers, screening equipment, and conveying systems.
Crane Track Beams: In factories, warehouses, and ports, the upper flange of the UB series is often used directly as the running track beam for bridge cranes and gantry cranes.
Conveyor Corridors: Used in mines, power plants, and ports for constructing support structures and walkways for long-distance belt conveyors.
Production Flow Chart

Project Case


Pack And Ship

Certificate





Customer Praise


Plant And Equipment




FAQ
1. What is your minimum order quantity?
A: 5 tons/container, mixed shipments are acceptable.
2. What are your payment terms?
A: Under FOB terms, 30% deposit in advance, 70% balance before shipment; under CIF terms, 30% deposit in advance, 70% balance upon presentation of a copy of the bill of lading.
3. What is your delivery time?
A: Shipment to port within 10-20 working days after receiving the deposit.
4. How long has your company been established?
A: We are a reputable building materials manufacturer with 20 years of experience in the steel industry.
5. Can we visit your factory to inspect the production process and product quality?
A: Of course, you are welcome anytime.
6. Do you have factory certificates and material composition analysis reports?
A: Yes, we have a professional quality analysis department.




