Leave Your Message
Galvanized Steel Angle truss steel joist Hangers truss steel joist
Floor Truss

Galvanized Steel Angle truss steel joist Hangers truss steel joist

Name Steel truss floor slab
Material
Coil steel bar, steel wire, galvanized sheet
Color Primary color
Function load-bearing
Usage Industrial and civil building floors

    Product Parameters

    Model Truss Height (mm) Top Chord Diameter (mm) Web Member Diameter (mm) Bottom Chord Diameter (mm) Truss Spacing (mm) Truss Width (mm) Theoretical Weight (kg/m)
    F200 200 12 6.5 10 200 100 3.354
    F210 210 12 6.5 10 200 100 3.401
    F220 220 12 7 10 200 100 3.595
    F230 230 12 7 10 200 100 3.706
    F240 240 12 7 10 200 100 3.762
    F250 250 12 7.5 10 200 100 4.060
    F260 260 12 7.5 10 200 100 4.126
    F270 270 12 7.5 10 200 100 4.192
    G70 70 12 4.5 12 200 100 3.059
    G80 80 12 4.5 12 200 100 3.072
    G90 90 12 4.5 12 200 100 3.086
    G100 100 12 5 12 200 100 3.186
    G110 110 12 5 12 200 100 3.206
    G120 120 12 5 12 200 100 3.228
    G130 130 12 5.5 12 200 100 3.252
    G140 140 12 5.5 12 200 100 3.275
    G150 150 12 5.5 12 200 100 3.300
    G160 160 12 6 12 200 100 3.581
    G170 170 12 6 12 200 100 3.618
    G180 180 12 6 12 200 100 3.657
    G190 190 12 6.5 12 200 100 3.861
    G200 200 12 6.5 12 200 100 3.907
    G210 210 12 6.5 12 200 100 3.954
    G220 220 12 7 12 200 100 4.001
    G230 230 12 7 12 200 100 4.049
    G240 240 12 7 12 200 100 4.098
    G250 250 12 7.5 12 200 100 4.611
    G260 260 12 7.5 12 200 100 4.676
    G270 270 12 7.5 12 200 100 4.742

    Description  

    The main purpose of composite floor deck trusses is to serve as a prefabricated formwork, while simultaneously bearing the loads during both the construction and service phases.  They simplify the construction process of steel structure floor slabs, combining multiple functions including load-bearing, formwork, support frame, and connection.

    By pre-integrating the steel reinforcement truss and galvanized steel sheet in the factory, they can be directly laid on the steel beams, eliminating the need for extensive on-site rebar tying, formwork construction, and support frame erection. This significantly accelerates construction speed, reduces labor costs, and ensures construction quality. They are widely used in multi-story factories, high-rise buildings, complex structures, and high-speed railways.

    Factory

    Galvanized steel strip (1)
    Rebar trusses (2)
    PPGI 2 (3)

    FAQ  

    Q: Can I visit your factory?

    A: Of course, we welcome customers from all over the world to visit our factory. However, some factories are not open to the public.

    Q: Can you send samples?

    A: Of course, we can send samples worldwide free of charge, but the customer will need to cover the shipping costs.

    Q: What is your delivery time?

    A: Generally, our delivery time is 15-45 days. Delivery time may be extended for very large orders or special circumstances.

    Leave Your Message