Manufacturer Steel Round Tube Steel Round Pipe
Product Parameters
| Product name | Round pipe |
| Technical standard | Cold Rolled /Hot Rolled |
| Thickness | 0.6 - 30 mm or customized |
| Length | 6m,12m or customized |
Imperial Specifications (Inch)
| Inch | Nominal Diameter (DN) | Outer Diameter (mm) | Wall Thickness Range (mm) |
|---|---|---|---|
| 1/2" | 15 | 21.3 | 0.6-2.5 |
| 3/4" | 20 | 26.9 | 0.6-2.5 |
| 1" | 25 | 33.7 | 0.6-3.0 |
| 1¼" | 32 | 42.4 | 0.6-3.5 |
| 1½" | 40 | 48.3 | 0.6-3.5 |
| 2" | 50 | 60.3 | 0.7-4.0 |
| 2½" | 65 | 76.1 | 0.7-5.5 |
| 3" | 80 | 88.9 | 0.8-6.0 |
| 4" | 100 | 114.3 | 0.9-6.0 |
| 5" | 125 | 139.7 | 0.9-6.0 |
| 6" | 150 | 168.3 | 1.0-6.0 |
| 8" | 200 | 219.1 | 1.0-10.0 |
| 10" | 250 | 273.0 | 1.3-10.0 |
Major applications include oil, gas, and water pipelines, building support structures, mechanical equipment components, sports equipment, and pipes for the medical and food industries.
Round tubes' economical cross-section makes them an ideal choice for manufacturing a wide range of engineering components, capable of withstanding bending and torsional forces while reducing weight.
FAQ
Q1: Why choose us?
A: Our company, as an internationally experienced and professional supplier, has been engaged in steel
business for more than ten years. We can provide a variety of steel products with high quality to our clients.
Q2: Can you provideOEM/ODM service?
A:Yes. Please feel free to contact us for more details.
Q3: What is your Payment Term?
A:One is 30% deposit by TT before production and 70% balance against copy of B/L; the other is Irrevocable L/C
100% at sight.
Q4: Can we visit your factory?
A: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your
case.
Q5:Can you provide sample?
A:Yes. Sample is free for regular sizes, but the buyer needs to pay freight cost.
Q6: How long is your delivery time?
A: Our daily inventory is more than 8000 tons, so for common product size, we just need 5 days from stocks. If
you would like to order product in special size, we need 20 to 30 days for new production.










