Architectural Factory Supply Steel Truss Rebar Truss
Product Parameters
| Model | Height (mm) | Top Chord (mm) | Diagonals (mm) | Bottom Chord (mm) | Pitch (mm) | Width (mm) | Unit Mass (kg/m) |
|---|---|---|---|---|---|---|---|
| A70 | 70 | 8 | 4 | 6 | 200 | 100 | 1.121 |
| A80 | 80 | 8 | 4 | 6 | 200 | 100 | 1.132 |
| A90 | 90 | 8 | 4 | 6 | 200 | 100 | 1.143 |
| A100 | 100 | 8 | 4 | 6 | 200 | 100 | 1.156 |
| A110 | 110 | 8 | 4.5 | 6 | 200 | 100 | 1.251 |
| A120 | 120 | 8 | 4.5 | 6 | 200 | 100 | 1.269 |
| B70 | 70 | 8 | 4 | 8 | 200 | 100 | 1.474 |
| B80 | 80 | 8 | 4 | 8 | 200 | 100 | 1.485 |
| B90 | 90 | 8 | 4.5 | 8 | 200 | 100 | 1.570 |
| B100 | 100 | 8 | 4.5 | 8 | 200 | 100 | 1.586 |
| B110 | 110 | 8 | 4.5 | 8 | 200 | 100 | 1.603 |
| B120 | 120 | 8 | 4.5 | 8 | 200 | 100 | 1.621 |
| B130 | 130 | 8 | 5 | 8 | 200 | 100 | 1.739 |
| B140 | 140 | 8 | 5 | 8 | 200 | 100 | 1.763 |
| B150 | 150 | 8 | 5 | 8 | 200 | 100 | 1.788 |
| B160 | 160 | 8 | 5 | 8 | 200 | 100 | 1.814 |
| B170 | 170 | 8 | 5.5 | 8 | 200 | 100 | 1.970 |
| C70 | 70 | 10 | 4.5 | 8 | 200 | 100 | 1.769 |
| C80 | 80 | 10 | 4.5 | 8 | 200 | 100 | 1.783 |
| C90 | 90 | 10 | 4.5 | 8 | 200 | 100 | 1.797 |
| C100 | 100 | 10 | 4.5 | 8 | 200 | 100 | 1.813 |
| C110 | 110 | 10 | 5 | 8 | 200 | 100 | 1.920 |
| C120 | 120 | 10 | 5 | 8 | 200 | 100 | 1.942 |
| C130 | 130 | 10 | 5 | 8 | 200 | 100 | 1.965 |
| C140 | 140 | 10 | 5 | 8 | 200 | 100 | 1.989 |
| C150 | 150 | 10 | 5.5 | 8 | 200 | 100 | 2.133 |
| C160 | 160 | 10 | 5.5 | 8 | 200 | 100 | 2.164 |
| C170 | 170 | 10 | 5.5 | 8 | 200 | 100 | 2.195 |
| D70 | 70 | 10 | 4.5 | 10 | 200 | 100 | 2.224 |
| D80 | 80 | 10 | 4.5 | 10 | 200 | 100 | 2.237 |
| D90 | 90 | 10 | 4.5 | 10 | 200 | 100 | 2.252 |
| D100 | 100 | 10 | 4.5 | 10 | 200 | 100 | 2.268 |
Description
Steel truss use
Reduce the thickness of concrete and save costs. It is suitable for buildings with large spans and high load-bearing capacity in the future.
The steel truss floor deck system combines the steel bars in the concrete floor slab with the construction formwork. It can not only bear the dead weight of wet concrete and construction load during the construction stage, but also bear the use load together with the concrete during the use stage.
It is widely used in multi-story factory buildings, steel structure buildings, irregular floors, concrete structures and high-speed railways, etc. The use of steel truss floor decking can reduce the thickness of concrete and save costs. It is suitable for buildings with large spans and high load-bearing capacity in the future.
Steel truss floor systems combine steel bars in concrete floor slabs with building formwork. During the construction stage, it is a load-bearing component that can withstand the dead weight of wet concrete and construction loads. During the construction stage, it can be used as a lateral support for steel beams. During the use phase, the steel truss and concrete work together to bear the use load.
FAQ
Q1: How many countries have you exported to?
A1: We export to over 50 countries, mainly Bangladesh, Indonesia, the Philippines, Serbia, Brazil, Iraq, Israel, and the UAE.
Q2: How long will it take to complete my order?
A2: Delivery time for in-stock products: 3-7 days after payment. Delivery time for customized products: 20-45 days after payment.
Q3: Can I have a sample for testing?
A3: Sample fees depend on the sample value, and shipping costs are your responsibility.
Q4: Do you inspect the products before packaging?
A4: All products undergo three inspection processes throughout the entire production process, including in-process inspection, random warehouse sampling, and pre-shipment inspection. We also accept third-party inspections.
Q5: Can I get your best price?
A5: Prices vary depending on steel grade, size, and quantity. Our goal is to provide you with the best price and highest quality products, and to guarantee long-term cooperation.
Please leave your contact information so we can proceed with production. We will contact you as soon as possible to provide the best solution. Please provide this information so we can calculate a price. If sheet metal processing is required, please provide drawings.
Q6: How to order?
A6: Buyer sends inquiry --> Buyer receives quotation --> Order confirmed --> Buyer pays deposit --> Seller prepares goods
Q7: What payment methods does your company support?
A7: We accept wire transfer (T/T) and letter of credit (L/C) at sight.










