Leave Your Message
Long-span Steel Structure Metal Building Steel Frame Prefabricated Warehouse Workshop Hangar
Steel Structure

Long-span Steel Structure Metal Building Steel Frame Prefabricated Warehouse Workshop Hangar

name Steel structure
Steel column
Q235,355B welded square tube column/Box column
Steel beam
Q235,355B welded H section steel/hot-rolled H section steel
Steel purlin
C/Z section purlin or square tube column
Gutter
Stainless steel gutter/UPVC gutter

    Item Materials Remark
    Steel Frame 1 H section column and beam Q345 steel, paint or galvanization
    2 wind resistant column Q345 steel,paint or galvanization
    3 Roof purline Q235B C/Z section galvanized steel
    4 Wall purline Q235B C/Z section galvanized steel
    Supporting system 1 Tie bar Q235 round steel pipe
    2 knee brace angle steel  L50*4,Q235 
    3 roof horizontal bracing φ20,Q235B steel bar, paint or galvanized
    4 column vertical bracing φ20,Q235B steel bar, paint or galvanized
    5 purline brace Φ12 round bar Q235
    6 knee brace angle steel, L50*4,Q235 
    7 casing pipe φ32*2.0,Q235 steel pipe
    8 gable angle steel M24 Q235B
    Roof and wall  1 Wall and roof panel corrugated steel sheet/sandwich panel
    protecting system 2 self tapping screw  
      3 Ridge tile color steel sheet
      4 gutter color steel sheet/galvanized steel/stainless steel
      5 down pipe  
      6 corner trim color steel sheet
    Fastener system  1  Anchor bolts Q235 steel
    2 Bolts  
    3 Nuts  


    微信图片_20250508144119
    Steel structure building is a new type of building system, which breaks through the industry boundaries between real estate, construction and metallurgy, and integrates into a new industrial system. This is the steel structure building system that is generally favored by industry insiders. Compared with traditional concrete buildings, steel structure buildings use steel plates or steel sections instead of reinforced concrete, which has higher strength and better earthquake resistance. And because the components can be factory-made and installed on-site, the construction period is greatly reduced. Because steel can be reused, it can greatly reduce construction waste and is more environmentally friendly. Therefore, it is widely adopted by countries around the world and used in industrial and civil buildings. The application of steel structure buildings in high-rise and super-high-rise buildings is becoming more and more mature, gradually becoming the mainstream construction technology, and is the development direction of future buildings.
    微信图片_20250508144125

    Steel Structure Warehouse Short Introduce:

    6

    微信图片_2025050814400289


    FAQ

    Q: Are you a manufacturer?
    A: Yes , we are a manufacturer, We have own factory, We have a leading power in producing and exporting
    galvanized steel pipes,Seamless steel tube and square tube,We promise that we are what you are looking for. 

    Q: Can we visit your factory?
    A:Warmly welcome once we have your schedule we will pick you up . 

    Q: Can you arrange the shipment?
    A: Sure, we have permanent freight forwarder who can gain the best price from most ship company and offer professional service.

    Q: How long is your delivery time?
    A: Generally it is 10-35 days .it is according to quantity.

    Q: How can we get the offer? 
    A:Please offer the specification of the product,such as material,size,shape,etc.So we can give the best offer. 

    Q: How do you make our business long-term and good relationship ? 
    A: 1.We keep good quality and competitive price to ensure our customers' benefit. 
    2.We respect every customer as our friend and we sincerly do business and make friends with them, no matter where they come from.

    Leave Your Message