200UB Australian Standard H-beams and H-sections for Construction Steel
Product Parameters
| Designation | Unit Weight (kg/m) |
Standard Sectional Dimension (mm) |
sectional Area (cm²) |
|||||
| M | H | B | t1 | t2 | r | A | ||
| 100UC一 | 15 | 14.8 | 97 | 99.0 | 5 | 7 | 10.0 | 18.87 |
| 150UC | 23 | 23.4 | 152.4 | 152 | 6.1 | 6.8 | 8.9 | 29.82 |
| 30 | 30 | 157.6 | 153.0 | 6.6 | 9.4 | 8.9 | 38.6 | |
| 37 | 37.2 | 161.8 | 154 | 8.1 | 11.5 | 8.9 | 47.34 | |
| 150UB | 14 | 14 | 150.0 | 75.0 | 5 | 7 | 8.0 | 17.85 |
| 18 | 18 | 155.0 | 75.0 | 6 | 9.5 | 8.0 | 22.96 | |
| 200UB | 18 | 18.2 | 198.0 | 99.0 | 4.5 | 7 | 11.0 | 23.16 |
| 23 | 22.3 | 201.6 | 133.0 | 5.0 | 7 | 8.9 | 28.68 | |
| 25 | 25.4 | 203.2 | 133.0 | 5.8 | 7.8 | 8.9 | 32.31 | |
| 30 | 29.8 | 207.0 | 134.0 | 6.3 | 9.6 | 8.9 | 38.24 | |
| 250UB | 26 | 25.7 | 248.0 | 124.0 | 5.0 | 8 | 12.0 | 32.68 |
| 31 | 31.4 | 251.5 | 146.0 | 6.1 | 8.6 | 8.9 | 40.08 | |
| 37 | 37.3 | 256.2 | 146.0 | 6.4 | 10.9 | 8.9 | 47.51 | |
| 310UB | 32 | 32.0 | 298.0 | 149.0 | 5.5 | 8 | 13.0 | 40.80 |
| 41 | 40.4 | 304.0 | 165.0 | 6.1 | 10.2 | 11.4 | 52.08 | |
| 47 | 46 | 307.2 | 166.0 | 6.7 | 11.8 | 11.4 | 59.29 | |
Product Description
Main Application Areas
Construction: Widely used in civil and industrial buildings, including large-span industrial plants and modern high-rise buildings, especially in earthquake-prone areas.
Bridges and Roads: Used in the construction of large bridges, highways, and other infrastructure.
Marine Engineering: Widely used in the manufacture of the framework for offshore platforms and ships.
Energy Sector: Used in energy-related structures such as high-voltage power towers.
Production Flow Chart

Project Case


Pack And Ship

Certificate





Customer Praise


Plant And Equipment




FAQ
1. Are you a factory or a trading company?
A: We are a factory located in Hebei, China.
2. What is your minimum order quantity (MOQ)?
A: Usually, a mixed shipment of one container is required, but orders of different sizes can be negotiated. Please contact us for details.
3. What are your payment terms?
A: Payment terms: 30% prepayment as deposit via Telegraphic Transfer (T/T), with the balance due against a copy of the Bill of Lading. Or an irrevocable Letter of Credit (L/C) at sight.
4. Do you have stock?
Yes, we have stock of commonly used standard sizes.
5. What is your sample policy?
A: If we have stock, we can provide samples, but the customer needs to pay the courier cost. All sample fees
will be refunded after you place an order.
6. Do you test all goods before shipment?
A: Yes, all goods undergo Material Testing Certificate (MTC) testing before shipment.
7. What is your delivery time?
A: Generally, in-stock items can be shipped within 5-10 days. If the product is not in stock, it will take approximately 30 days depending on the quantity required.








